Nobleton Water and Wastewater Servicing Municipal Class Environmental Assessment Study
In November 2018, The Regional Municipality of York initiated the Schedule C, Nobleton Water and Wastewater Servicing Municipal Class Environmental Assessment Study (EA Study). To accommodate future growth in the community, the EA Study looked at long-term water and wastewater servicing options in the Township of King.
What is the status of Nobleton’s EA Study?
The Nobleton long-term water and wastewater servicing EA Study is a Schedule C class environmental assessment study with four phases.
During phase one, we hosted an Open House on February 28, 2019, and outlined the purpose of the study and the elements of the study. In phase two, we hosted the second online Open House on November 25, 2020, and reviewed the long-term water and wastewater servicing solutions that have been considered. The third online Open House was hosted on July 20, 2021, and the preferred design solutions for water and wastewater servicing and the recommended solutions were presented.
We completed the fourth phase and filed the Notice of Completion on November 3, 2021. The notice placed the completed Environmental Study Report on public record for a comment period of 32 days from November 4, 2021 to December 6, 2021. No further public comments were received during that time.
Schedule C Municipal Class EA - Completed
Phase 1 - Problem or Opportunity - Fall 2019
- Identify the problem or opportunity
- Open House #1 completed
Phase 2 - Alternative Solutions - Fall 2020
- Identify and evaluate alternative solutions to the problem
- Open House #2 completed
- Select preferred solution
Phase 3 - Alternative Designs - Summer 2021
- Identify and evaluate alternative designs for the preferred solution
- Open House #3 completed
- Select preferred design
Phase 4 - Environmental Study Report - Fall 2021
- Complete Environmental Study Report
- 30-day review period for public and review agencies
The Ministry of the Environment, Conservation and Parks provided additional comments on the completed Environmental Study Report and minor revisions were made to the Environmental Study Report and supporting appendices. For a list of changes, please refer to Addendum No. 1.
Notice of Completion and Environmental Study Report
- Addendum No. 1 - New
- Notice of Completion - November 3, 2021
- Environmental Study Report - Updated
Appendix A
Phase 3
Appendix B
- Study 1A: Water System Capacity Optimization Study
- Study 1B: Wastewater System Capacity Optimization Study
- Study 2A: Existing Water System Hydraulic Analysis
- Study 2A: Future Water System (Phase 2) Hydraulic Analysis
- Study 2B: Existing Wastewater System Hydraulic Analysis
- Study 3A: Water Needs Assessment and Justification Study
- Study 3B: Wastewater Needs Assessment and Justification Study
- Study 4: Technology Options to Meet Receiving Water Quality Study
- Study 5: Assimilative Capacity Study
- Study 6: Fluvial Geomorphology Assessment
- Study 7: Background Hydrogeological Assessment
- Study 7: Oak Ridges Moraine Conceptual Model Cross Section
- Air Quality Impact Assessment - Updated
- Stage 1 Archaeological Assessment pages 1-90 - New
- Stage 1 Archaeological Assessment pages 91-129 - New
- Noise Impact Assessment
- Source Water Protection Memo
- Municipal Class EA Environmental Impact Study (EIS)
- Nobleton Supply Well Groundwater Exploration Program
- Cultural Heritage Report
Appendix C
- Notice of Study Commencement
- Public Engagement and Communications Plan
- Stakeholder Sensitivity Analysis
- Public Consultation Centre #1 Summary Report
- Public Consultation Centre #2 Summary Report - Updated
- Public Consultation Centre #3 Summary Report
- Notice of Completion
- Correspondence and Feedback from Stakeholders - 1 of 3 - New
- Correspondence and Feedback from Stakeholders - 2 of 3 - New
- Correspondence and Feedback from Stakeholders - 3 of 3 - New
- Indigenous Consultation Log - New - New
- Correspondence with Indigenous Communities - New
Accessible formats or communication supports for this Environmental Study Report are available upon request. Please contact Afshin Naseri at @email or call 1-877-464-9675 ext. 75062
Information from Open House 3
Open House 3 was held on Tuesday, July 20, 2021.
- Watch Open House 3 recording
- Download Open House 3 presentation
- Download Open House 3 presentation with speaking notes
- Public Consultation Centre 3 Summary Report
- Appendix A - Public Consultation Centre 3 Briefing
- Appendix B - Notice of Open House
- Appendix E - Survey Questions
- View Open House 3 Frequently Asked Questions
Accessible formats or communication supports for these documents are available upon request. Please contact Afshin Naseri at @email or call 1-877-464-9675 ext. 75062
Information from Open House 2
Open House 2 was held on Wednesday, November 25, 2020.
- Watch Open House 2 recording
- Download Open House 2 presentation
- Download Open House 2 presentation with speaking notes
- Public Consultation Centre 2 Summary Report
- Appendix A - Public Consultation Centre 2 Briefing
- Appendix B - Notice of Open House
- Appendix E - Survey Questions
- View Open House 2 Frequently Asked Questions
Accessible formats or communication supports for these documents are available upon request. Please contact Afshin Naseri at @email or call 1-877-464-9675 ext. 75062
Public Notices
- Notice of Open House 2 - September 3, 2020
- Nobleton Water and Wastewater Servicing Update — May 12, 2020
- Notice of Open House 1 - February 14, 2019
- Notice of Study Commencement — November 15, 2018
If you have any questions, please contact:
Afshin Naseri, P. Eng.,
Senior Project Manager
The Regional Municipality of York
Public Works
17250 Yonge Street
Newmarket, Ontario L3Y 6Z1
@email
1-877-464-9675 ext. 75062
Fax 905-830-6927